We have a professional construction team and complete construction equipment, which can provide safe, standardized and efficient cooling tower construction and demolition services, ensuring that the project is completed on time and with high quality, in line with relevant construction standards and safety specifications. The specific services include:

 

3.1 Construction Services

  • Site Preparation: Conduct on-site investigation and cleaning, sort out the construction site, lay construction roads, install temporary water and electricity facilities, and create a good construction environment.
  • Component Installation: Strictly follow the design drawings and construction specifications to carry out the installation of cooling tower components, including tower body assembly, fill material installation, water distribution system installation, fan installation, motor and reducer installation, and auxiliary equipment installation. Ensure that the installation accuracy meets the requirements and the connection is firm and reliable.
  • Anti-corrosion and Anti-rust Construction: Carry out professional anti-corrosion and anti-rust treatment on the tower body, metal components and other parts according to the environmental conditions and design requirements, including derusting, painting, anti-corrosion coating, etc., to extend the service life of the cooling tower.
  • System Commissioning: After the construction is completed, conduct comprehensive system commissioning, including water pressure test, fan test, circulating water system test, etc., to ensure that all components operate normally, the cooling system runs stably, and meets the design performance indicators.
  • Construction Acceptance: Organize relevant personnel to conduct construction acceptance, check the construction quality, installation accuracy, safety performance and other aspects, and hand over the project to the customer only after passing the acceptance.

3.2 Demolition Services

  • Demolition Scheme Design: According to the type, scale, location of the cooling tower and the surrounding environment, design a scientific and safe demolition scheme, including demolition sequence, construction methods, safety protection measures, waste disposal plans, etc., to ensure the safety of the demolition process and avoid impact on the surrounding environment and other equipment.
  • Safety Protection: Before demolition, set up safety warning signs, isolation barriers and other protective facilities around the construction site, and conduct safety training for construction personnel to ensure that the demolition operation is carried out in strict accordance with safety specifications.
  • Step-by-Step Demolition: Demolish the cooling tower step by step in accordance with the demolition scheme, first dismantle the auxiliary equipment, then the fan, water distribution system, fill material, and finally the tower body, to avoid collapse and other safety accidents.
  • Waste Treatment and Site Cleaning: Classify and dispose of the waste generated after demolition (such as metal components, fill material, concrete debris, etc.), recycle usable resources, and clean the construction site after demolition to restore the site to its original state.