The Closed Cooling Tower Installation For A Certain Mechanical And Electrical Equipment Laboratory Can Be Delivered Within 25 Days

Nov 28, 2025

As the year is coming to an end, Latino has completed the installation of a closed cooling tower for a certain mechanical and electrical equipment laboratory. Due to the limited on-site space, both parties have communicated multiple times to customize the closed cooling tower project in a modular way. The production work was completed in 25 days. The 304 stainless steel water collection trough was used, and the fan and spray pump were turned off at low temperatures to save operating costs. When the external environment drops below a certain value, the electric heater in the water collection tank will automatically start. This set of closed cooling tower avoids the structure of the water collection tank. All motors adopt high-end special motors for cooling towers, reducing the failure rate and increasing the safety factor of the system during testing and detection.

DM202511281059120011
Latino has over 10 years of industry experience and a wealth of case studies, covering industries such as chemical engineering, pharmaceuticals, photovoltaic, petroleum, metallurgy, smelting, casting, forging, LNG, papermaking, and textiles. We look forward to achieving win-win cooperation with you.

You Might Also Like